Master Specifications (MF24) |
|
Division 31 - Earthwork |
|
|
Section |
Description |
Last Update |
310000
|
Earthwork |
6/1/2024 |
310001
|
Earthwork Materials |
6/1/2024 |
312316.26
|
Rock Removal |
6/1/2024 |
312319
|
Dewatering |
6/1/2024 |
312323.33
|
Flowable Fill |
6/1/2024 |
312500
|
Erosion And Sedimentation Controls |
6/1/2024 |
312514.13
|
Hydraulically-Applied Erosion Control |
6/1/2024 |
313213.16
|
Cement Soil Stabilization |
6/1/2024 |
313600
|
Gabions |
6/1/2024 |
315000
|
Excavation Support And Protection |
6/1/2024 |
315200
|
Cofferdams |
6/1/2024 |
316213
|
Precast Concrete Piles |
6/1/2024 |
316216
|
Steel Piles |
6/1/2024 |
316219
|
Timber Piles |
6/1/2024 |
316223
|
Composite Piles |
6/1/2024 |
316300
|
Bored Piles |
6/1/2024 |
316316
|
Auger Cast Grout Piles |
6/1/2024 |
316329
|
Drilled Concrete Piers And Shafts |
6/1/2024 |
|